What are the 5 steps of Sikla Steel Frames Pre Fabrication?

What are the 5 steps of Sikla Steel Frames Pre Fabrication?

Sikla Steel Frames Pre-Fabrication in a nutshell

Pre-fabricated assemblies offer wide potential savings and are an indispensable element of DfMA and Offsite Construction. But how is the process of steel frames pre-fabrication, before its delivery and assembly on-site? It surely has a detailed admin process "behind de scenes, but in a practical perspective, we can summarize it in 5 main steps.
Have a look at the next lines to learn more about this key process and don't miss the video at the end: it really shows how it all happens!

Unique steel frames - as siFramo ones - need to rely on a pre-fabrication production line set up to be quick and efficient with large lots of individual frames. So how is this done?
Here are the 5 big steps:

  1. Planning & Design
  2. Cutting Process
  3. Pre-Assembly
  4. Packing
  5. Transport to site
Sikla 5 steps of steel frames pre fabrication 1 Planning & Design

1. Planning & Design

Abbots in partnership with Sikla in-house Design Engineers work with you to put together a design that suits your project and, finally, will also carry out the structural calculations. For this purposes, several available BIM plugins and bespoke analysis software are used.

Once all the drawings are discussed, revised and finally approved by your team, then the next step can follow.

Sikla 5 steps of steel frames pre fabrication 2 Cutting Process

2. Cutting Process

According to the previously approved design, the warehouse team can now take over.
Bill of materials and cutting schedules are prepared and the cutting process will start. At this point, the cutting performance is a key element of all the modular system time-saving concept! For this reason, our operatives work with automated CNC equipment, allowing the process to be way more efficient.

Sikla 5 steps of steel frames pre fabrication 3 Pre-Assembly

3. Pre-Assembly

The siFramo beam sections have strategically engineered hole placements on each face. This allows every SiFramo components to be located anywhere along the beam, being fixed with one single type of self-forming screw, using an impact driver.
There is no need for drilling or handling nuts, bolts and washers. Such a simple assembly process!

Sikla 5 steps of steel frames pre fabrication 4 Packing

4. Packing

All the frames are now packed according to the installation and to the sequence you specify. This includes customized pallet labelling, according to your project requirements

Sikla 5 steps of steel frames pre fabrication 5 Transport to Site

5. Transport to Site

Finally, the pre-assembled steel frames are shipped to the construction site, ready to be installed!

What to finally expect?

At a glance, these are all your advantages of being supplied with pre-fabricated modular steel frames:

  • Reduced planning time
  • Minimised assembly work
  • Shorter construction time
  • Efficient relief of technical staff
  • Calculation security with fixed end cost
  • Guarantee with factory pre-fabrication
  • Just-in-time delivery to the construction site
  • Consistent quality (quality checks performed)
  • No storage of items on-site and residual material
Sorry, this item is currently out of stock.
We currently hold [remaining-stock] units of this item in stock. The remainder will be put on back order.
You cannot order more of this item than we currently hold in stock.
You must order at least [min-order-qty] of this product.
You must order at least [min-order-qty] of this product. We currently hold [remaining-stock] in stock. The remainder will be put on back order.

This site uses cookies. By continuing your visit, you accept their use as set out in our Cookie Policy. OK